NOVA RENOVATIONSBUILDING DREAMS

Tub to Shower Conversion Cost in Waterloo Region

Short answer: A tub-to-shower conversion in Waterloo Region typically runs $9K-14K tiled ($5K-9K acrylic one-day). Nova's fixed-price Essential package starts at $13,000 + HST ($14,690 with HST) and usually takes 1-2 weeks.

Most tub-to-shower conversions in Kitchener, Waterloo, Cambridge and Guelph land in this market range: $9K-14K tiled ($5K-9K acrylic one-day). Nova's Essential tub-to-shower package starts at $13,000 + HST, which is $14,690 with HST once HST is added. The job usually takes 1-2 weeks.

The price is fixed before work starts. You know the number before you sign, and it does not creep up with surprise add-ons that were part of the original scope.

That starting price assumes a standard swap: your old tub space (Tub space about 60x32, any bathroom) becomes a fully tiled shower, and the vanity, toilet and floor stay where they are. The rest of this guide explains what moves the price up or down so you can judge any quote you receive.

What a tub-to-shower conversion actually involves

It is more than pulling out a tub and dropping in a shower. A proper conversion has these steps:

  1. Remove the tub and the tile or surround around it.
  2. Check the framing and subfloor underneath for water damage.
  3. Build a new shower base and set the drain.
  4. Install the new shower valve and shower plumbing.
  5. Waterproof the base and walls.
  6. Test the base for leaks before any tile goes on.
  7. Tile the walls, install the glass, patch drywall and paint.

Plumbing is done by a licensed plumber. Any electrical work, such as a new fan or light, is done by a licensed electrician. If a contractor skips that part to save money, you carry the risk.

What changes the cost the most

1. Tile choice and tile size

Tile is one of the biggest swing items. Basic ceramic is less expensive than large-format porcelain or natural stone. Large tile also takes more skill to lay flat, and patterns such as herringbone take more hours. More cuts mean more labour.

2. Shower base type

A tiled base with a low curb is a common, reliable choice. A curbless entry costs more because the floor around the shower may need to be lowered or reframed so water still runs to the drain. It looks great and helps with accessibility, but it is a bigger job.

3. Glass

A single fixed glass panel costs less than a full frameless door and panel set. A sliding door sits in between. Custom-cut glass is ordered after the tile is done and measured, which is one reason the schedule matters.

4. Niche, bench and extra features

A recessed niche is practical, and one is included in Nova's Essential package. Extra niches, a built-in bench, a lit niche, a rain head or a handheld bar add materials and labour. Each one is small on its own, but they stack up.

5. Moving the drain or the valve

Tubs and showers drain in different places. If the shower drain stays near the old tub drain, the job is simpler. If the drain has to move, the plumber may need to open the floor or work from below. Moving plumbing may also need a permit, so confirm with your city building department before work starts.

6. What is hiding behind the tub

Older homes in Kitchener, Cambridge and Guelph can have surprises behind a tub: soft subfloor, rotted wall framing, old pipe, or past leaks. This is the main reason an on-site visit matters. A photo and a tape measure tell a lot, but a contractor standing in your bathroom sees more. Repairs to rotted wood are a real cost driver, and a good contractor explains them clearly before you sign.

7. Wall and ceiling condition

If the walls around the tub are plaster, or the drywall is damaged beyond a simple patch, expect extra work. Mould behind a tub surround also needs to be dealt with properly, not painted over.

Get a fixed price for your project

Free on-site visit in Kitchener, Waterloo, Cambridge or Guelph. We measure, take photos and send you one clear fixed price.

Tiled shower, acrylic insert or one-piece unit?

You will see low prices for pre-made shower inserts and wall panels. They can work in the right bathroom, but they are not the same as a tiled shower. Here is how they compare in general terms:

OptionUpfront costLook and feelThings to think about
Acrylic or fibreglass insertLowerBasic, fixed sizesLimited choice of size and style, seams can wear over time
Tiled shower on a Kerdi systemHigherCustom, high-end lookNeeds skilled installation and proper waterproofing
Curbless tiled showerHighestSeamless, accessibleOften needs floor framing changes

Nova's Essential tub-to-shower package is a fully tiled shower. For a bigger project, such as a full gut with a new layout, see our bathroom renovation cost guide for Kitchener-Waterloo.

What Nova includes

Here is what is in the Essential tub-to-shower package:

Shower only. Old tub and tub-wall tile out. Fully tiled shower: Kerdi shower pan with low curb, Kerdi walls, 24-hour water test, walls tiled to 7 ft, one niche, glass panel. New shower valve. Patch drywall and repaint the bathroom. Vanity, toilet and floor stay.

Two details are worth knowing about. First, the shower is built on Schluter Kerdi waterproofing. Second, we run a 24-hour water test before any tile goes on. If there is a leak, we find it while the walls are still open, not after you have a finished shower and a stained ceiling below.

Also included is a 2-year workmanship warranty.

What is usually not included

A basic conversion keeps your vanity, toilet and floor. If you also want those replaced, or you want a new layout, you are looking at a larger project. That is a different price. Ask any contractor to list exactly what is in and what is out of the quote so you can compare fairly.

Is it worth converting a tub to a shower?

For many homeowners, yes. A shower is easier to step into, simpler to clean and often feels larger. It is a popular choice for ageing in place, for busy households, and for bathrooms where the tub never gets used.

One thing to think about: if this is the only tub in your home, some buyers want at least one tub for young children. If you plan to sell in the next few years, think about whether another bathroom in the house has a tub.

How long does it take?

Plan for 1-2 weeks for a standard conversion. The time includes demolition, plumbing, waterproofing, the water test, tile, glass and finishing. Glass is usually ordered once the tile is in and the opening can be measured, so that step can affect the schedule. More complex jobs, such as a drain move or a curbless entry, take longer.

Common mistakes to avoid

Get a fixed price for your project

Free on-site visit in Kitchener, Waterloo, Cambridge or Guelph. We measure, take photos and send you one clear fixed price.

How to get an accurate price

The online starting price is a good guide, but your bathroom decides the final number. Here is how it works with Nova:

  1. Book a free on-site visit. We come to your home in Kitchener, Waterloo, Cambridge, Guelph, Elmira, St. Jacobs, New Hamburg, Baden, Ayr, Wellesley, Breslau, Fergus or Elora.
  2. We measure and take photos. We look at the tub, the walls, the drain location and the access to your plumbing.
  3. You get a detailed fixed-price quote. It lists what is included, so you can compare it to any other quote.
  4. You decide. The quote is valid for 30 days, so there is no pressure to sign on the spot.

Prices are before HST (13%). To reserve your spot, a 30% deposit is required once you sign.

If you would like to talk first, call German Rivera at Nova Renovations on (226) 507-0723. If you are also thinking about a larger bathroom project, our Kitchener-Waterloo bathroom cost guide can help you plan.

Frequently asked questions

How much does a tub to shower conversion cost in Waterloo Region?

The typical market range is $9K-14K tiled ($5K-9K acrylic one-day). Nova's Essential package starts at $13,000 + HST, or $14,690 with HST, at a fixed price agreed before work starts.

How long does a tub to shower conversion take?

A standard conversion usually takes 1-2 weeks. A drain move, curbless entry or hidden water damage can add time.

What is included in Nova's tub-to-shower package?

Shower only. Old tub and tub-wall tile out. Fully tiled shower: Kerdi shower pan with low curb, Kerdi walls, 24-hour water test, walls tiled to 7 ft, one niche, glass panel. New shower valve. Patch drywall and repaint the bathroom. Vanity, toilet and floor stay.

Do I need a permit to convert a tub to a shower?

It depends on the work. Moving plumbing or changing structure usually needs a permit, while a simple swap in the same spot may not. Confirm with your city building department before work starts.

Is a tiled shower better than an acrylic insert?

A tiled shower on proper waterproofing gives you more choice in size and style, and it looks custom. An acrylic insert costs less upfront but comes in set sizes. The right choice depends on your budget and your bathroom.

Why do you need to visit my home before quoting?

Hidden problems such as a soft subfloor, old pipes or an awkward drain location change the cost. During the free on-site visit we measure and take photos, then send a detailed fixed-price quote.

Get your fixed price

Tell us about your project. German (General Contractor) will contact you, usually the same business day.

No spam. We only use your details to answer your request.